ebb Logistics
EngagementWe check layout and slotting before recommending new equipment.

Home / What we do / Engineering services

Warehouse layout and engineering services

We measure how your warehouse actually runs, then design the layout, slotting and material handling around what we find. Often the fix is moving product rather than buying equipment. We sell no hardware and take no commission from integrators, so that recommendation costs us nothing.

By the hourThroughput measured across a full season, including peak
Travel timeThe largest hidden cost in most warehouse layouts
Your ordersA measured order profile, not a design template
No commissionsWe sell no hardware and take nothing from integrators
In shortA brief explanation of the service and what it covers.

What are warehouse engineering services?

The short answer

Warehouse engineering services are the design of facility layout, slotting and material handling from measured order and throughput data rather than a template. The work starts by measuring pick density, travel distance and throughput by hour and season, then sizes the layout and equipment to how the operation actually runs. It often shows that moving fast-moving product closer to packing delivers what an automation purchase was meant to, at a fraction of the cost.

We measure your order and throughput data, then design facility layout, slotting and material handling around what it shows.

The problemThe terms and billing details we review before estimating savings.

Find the cause of warehouse delays before investing.

When throughput falls short, equipment is the usual proposal. We measure the operation first, because the cause is often something a purchase would not fix.

Long travel distances, poorly placed fast-moving products and conflicts between picking and replenishment can all reduce output. Layout and slotting changes may address these problems.

We compare process and layout improvements with equipment options before recommending a capital investment.

Why usWe work for shippers and receive no compensation from carriers.

What makes this different.

01

Current operations measured first

We measure pick density, travel distance, congestion and hourly throughput, including seasonal peaks.

02

Layout improvements considered first

We check whether moving product or changing the layout solves the problem before anyone commits capital.

03

Independent equipment advice

We sell no hardware and receive no commissions from integrators. We can recommend using your existing building and equipment when that meets your needs.

Why this orderWe review your agreement and shipment data before recommending changes.

How this actually runs.

  1. Measure the operation

    We use system data to measure orders, pick density, travel distance and throughput by hour and season.

    Weeks 1–2
  2. Design against the data

    We recommend layout, slotting and material handling changes based on measured demand, including peak periods.

    Week 3
  3. Sequence and cost the change

    We identify the cost and order of each change, separating improvements using existing resources from those needing capital.

    Week 4
Common questionsContact us if your question is not listed. We can help you assess whether the service fits your needs.

Questions shippers ask first.

How do we know whether we need automation or just a better layout?
We first measure pick density, travel distance and throughput. If layout or product placement is the main constraint, slotting changes may help before new equipment is needed.
What is slotting optimization and what does it typically achieve?
Slotting assigns products to storage and picking locations based on demand, size and which items are ordered together. Better placement can reduce travel distance and improve picking efficiency.
Can you design a layout before we have picked a building?
Yes. We can define throughput, storage and dock requirements before you select a building, giving you a clear specification for the search.
Do you sell the equipment you recommend?
No. We receive no commissions from equipment vendors or integrators. Recommendations are based on your operational requirements.

Request a free contract review.

Send your agreement for a written review of potential savings and recommended next steps.

Or call 888-356-4421

Free, and no obligation. A written evaluation back inside 48 hours. No fee unless we find documented savings. How we handle your documents

  • Your current agreement, any carrier
  • One recent invoice, if you have one
  • A written evaluation back inside 48 hours